Skip to content
Solar Farm Facts
- 563 kilowatt (kW) Solar photovoltaic (PV) System
- Online: October 2018
- Footprint: 3 acres Golden Valley Electric Association (GVEA) Solar Graphic
- Contractor: ABS Alaskan, Inc.
- Panel manufacturer: CSUN
- Each of the 1,760 panels will generate up to 320 watts.
- Contractor: ABS Alaskan, Inc.
- Cost: $850,000 after a $225,000 grant supplied from United States Department of Agriculture (USDA) Rural Energy for America Program (REAP)
- Annual energy production is estimated to equal the annual energy used in 71 homes (using an average of 660 kilowatt-hours (kWh) per month)
- Located on GVEA property next to BESS and Wilson Substation – Visible from VanHorn Road
网赌平台推荐
大智创新
Buying-platform-feedback@jiwenmuju.com
欧洲杯买球
The-new-Portuguese-lottery-in-Macao-service@hrml7c.com
Euro-2024-betting-contactus@fenghangyiqi.com
Grand-Lisboa-contactus@wuzhongcobsd.com
Complete-gambling-platform-marketing@tanqingcorp.com
Asian-gaming-marketing@zmdr.org
European-Cup-buy-ball-app-support@jiwenmuju.com
欧洲杯买球正规平台
百林通信
易胜博
网赌平台推荐
七彩云南
商都旅游
博天堂
诺亚教育网学习资料
欧洲杯买球
Online-gambling-platform-hr@malutang.com
济南天气预报
途牛济南旅游网
海贼王熊猫论坛
遂宁人才网
文灿股份
文登之窗
汇智光华
世纪之村
51CTO系统频道
单游之家
站点地图
乐酒客
丝路明珠网
博克森
创维官方商城